Elita Garden Vista Progress Update

29 May 2009

Photographs of Mock-up Units (Block-2)


Living/Dining Floor tile laying in progress.

Floor tiling joint

Aluminium window frame fixing

Aluminium window frame fixing (Inside)

Balcony railing after fixing

Balcony railing after fixing

Stair railing fixing in progress

AC ledge railing fixing in progress

Floor tile protection after laying

Toilet pipe line work in progress

Loby area after wall surface preparation

Out side plastering work

Mock-up unit at (BL-2)access way in progress

Looking out from mock up unit