 Living/Dining Floor tile laying in progress. |
 Floor tiling joint |
 Aluminium window frame fixing |
 Aluminium window frame fixing (Inside) |
 Balcony railing after fixing |
 Balcony railing after fixing |
 Stair railing fixing in progress |
 AC ledge railing fixing in progress |
 Floor tile protection after laying |
 Toilet pipe line work in progress |
 Loby area after wall surface preparation |
 Out side plastering work |
 Mock-up unit at (BL-2)access way in progress |
 Looking out from mock up unit |
|